BCPM0074: PROJECT MANAGEMENT
PROJECT MANAGEMENT
项目类别:管理

Hello, dear friend, you can consult us at any time if you have any questions, add  WeChat:  zz-x2580


BCPM0074: PROJECT MANAGEMENT II

1. Introduction:
This document includes important information regarding your summative assessment.
Please read this document in full and refer to it while preparing your assignment.
This coursework will be marked on a scale of 100 and constitutes 100% of your module
assessment.
Please note that this is an individual coursework.
The module assignment is designed to support students’ learning by giving them the
opportunity to apply the core concepts introduced in the lectures to a real-life project.
Students will need to show evidence of an awareness of the different value processes that
unfold as the project develops, the broad range of stakeholders involved in a construction
project and the importance of managing their expectations and the role of the project
manager in supporting value creation and project success.
2. Assessment Brief:
The Google Headquarters, Kings Cross London
Global ‘tech’ giant Google is building its first wholly owned building outside the United States
in London, Kings Cross. The purpose-built 11-storey building will provide over 1 million square
feet of commercial and office space, of which Google will occupy approximately 650,000
square feet. The new building dubbed ‘Landscraper’ will be 72 metres tall at its highest point,
and 330m long. The building is expected to provide office accommodation for up to 4,500
employees of Google. The building will also provide ancillary spaces including cafes, a gym,
multi-use games areas as well as landscaped terraces and a running track on the rooftop. The
concept design is led by Heatherwick Studio and Bjarke Ingels Group (BIG) and is expected to
be developed in highly innovative and sustainable way to support future ways of working.
This new development is expected to contribute to the Knowledge Quarter and King’s Cross’s
growing knowledge-based economy. The project is also viewed as a major part of
regeneration plans in the Kings Cross area. Planning permission was granted by Camden
Council in 2017 with project completion expected at the end of 2024.
Your Task
Produce a 3,000-word report for the client’s project manager (consultant) highlighting issues
and strategies for maximizing project outcomes in the following areas:
1. Managing the varying interests of the different stakeholders
2. Strategy for achieving overall project success and benefit realization
3. Social and environmental implications
4. Economic viability and attainment of value
3. Assessment sequence and weighting:
Summative
Assessment
Weighting
(%)
Submission
date
Corresponds to
Learning Outcomes
L1 L2 L3 L4 L5 L6 L7
Essay 100% 19/5/23 x X X X X X X
4. Format:
This assignment has a limit of 3000 words (excluding tables, figures, references and
appendices). All sources and references should be acknowledged using the Harvard
referencing system.
There is a 10% leeway for the word limit: submissions that are within 10% over or under the
word count won’t be penalised.
Type of content Counts towards the word limit
Table of contents No
Reference list or bibliography at the end No
Cover page No
Diagrams, annotated pictures, figures and any
other visuals
No
Appendices No
Abstract No
Acknowledgements No
Footnotes Yes
Tables in the main text Yes
In-text citations Yes
5. Marking Criteria:
Criteria Max Marks
Introduction: purpose and introduction to
the content of the report
10%
Evidence of knowledge and comprehension
of the core concepts and issues discussed in
the lectures
40%
Evidence of critical thinking, analysis and
discussion
30%

留学ICU™️ 留学生辅助指导品牌
在线客服 7*24 全天为您提供咨询服务
咨询电话(全球): +86 17530857517
客服QQ:2405269519
微信咨询:zz-x2580
关于我们
微信订阅号
© 2012-2021 ABC网站 站点地图:Google Sitemap | 服务条款 | 隐私政策
提示:ABC网站所开展服务及提供的文稿基于客户所提供资料,客户可用于研究目的等方面,本机构不鼓励、不提倡任何学术欺诈行为。